All products

Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa

We independently review everything we recommend. When you buy through our links, we may earn a commission. As an Amazon Associate I earn from qualifying purchases. Learn more ›

Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa

Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa

4.4

70 ratings

View on AMAZON

Highlights

  • Premium Faux Leather: This sectional sofa is crafted from high-quality PU faux leather that is soft and breathable. While less expensive than genuine leather, it offers a upscale appearance like genuine leather. This sectional leather sofa can not only meet your desire for light luxury and high-end furniture, but also meet your budget-friendly needs. It perfectly blends modern and mid-century styles, making it an ideal sofa for living rooms, bedroom, offices, and apartments
  • Spacious and Comfortable: This 100 inch leather sectional couch with 3 seat & ottoman is perfect for 3-4 people. The modular sofa features high-resilience foam seat cushions and backrests that offers superior comfort and lasting ergonomic support for your back ,waist, hip. The movable ottoman allows you to put your feet up and stretch out completely. The wide seating area and removable armrests pillows deliver a cozy and comfort experience for your rest and relaxation
  • Easy to Care: This mid-century modern couch features a durable, waterproof & pet-friendly faux leather fabric that can be easily wiped clean with a dry or damp cloth, keeping your sofa clean and comfortable with effortless. This faux leather sofa is easier to maintain than real leather and perfect for busy young people or the families with kids & pets. Leather side pockets provide the storage space for small items. Tips: There may be slight color difference due to light or display reasons
  • Sturdy and Durable: The frames (armrests, backrests, seat frames, support legs) of sectional leather couches are made of solid wood, offering durability and stability for long-lasting use. Sturdy wooden frame easily support up to 800lbs. The modern and minimalist design features clean lines and a sleek profile, effortlessly complementing a variety of home decors—from contemporary and industrial to mid-century modern. It's a stylish centerpiece for your living space
  • Easy to Assemble: This modular sectional sofa is quick and easy to assemble without the tools by following a few simple steps instructions. The leather sectional sofa ships in 2 boxes which may arrive separately. Please check all parts before full setup. Note: The cushions, backrest, and pillows are vacuum-packed. After unpacking, please pant it gently to fluff and allow 72 hours for fully expand. If you have any questions to our sofa, please feel free to contact us

Photos

Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa
Vesgantti 100" PU Faux Leather Sofa with Movable Ottoman, 3 Seater L Shaped Leather Sectional Couch with Side Pocket, Comfy Mid Century Modern Modular Couch for Living Room, Apartment, Cocoa

Product specs

SpecificationDetails
Brand NameVesgantti
Sofa TypeSectional
Room TypeLiving Room
Collection NameVesgantti
Seat Cushion Quantity3
Indoor Outdoor UsageIndoor
Orientationmodular
Included ComponentsUser's Manual
UPC840452644113
ASINB0FWY41RF6
Item Type NameSectional
Item Height34.65 inches
ManufacturerVesgantti
Upholstery Fabric TypeFaux Leather
Frame Material TypeWood
Material TypeWood
Product Care InstructionsWipe Clean with Dry Cloth
Seat Fill MaterialFoam
Furniture Leg MaterialWood
Seat Back Fill MaterialFoam
Fill MaterialHigh Density Foam
Material Featuressoft, breathable, waterproof, pet-friendly, durable
Cushion ConstructionHigh-resilience foam
Required AssemblyYes
Component Connector AssemblyInstallation Required
Item Dimensions D x W x H34.65"D x 100"W x 34.65"H
Item Weight81.8 Pounds
Size3 Seater & 1 Ottoman-100" L
Arm Height34.65 Inches
Weight Capacity Maximum800 Pounds
Seating Capacity4.00
Additional FeaturesRemovable Cover
Item Firmness Descriptionmedium-firm
Seat Cushion ConfigurationMultiple Cushion Seat
Is Customizable?No
ColorCocoa
Style NameModern
ShapeL-Shape
Arm StylePadded
PatternSolid
Back StylePillow Back
Cushion StyleBoxed Edge
Upholstery ColorCocoa
BrandVesgantti
Assembly RequiredYes
Weight Limit800 Pounds
Product Dimensions34.65"D x 100"W x 34.65"H
TypeSectional
StyleModern
Special FeatureRemovable Cover

Related

GiftsPick.com

© 2026 GiftsPick.com. All rights reserved. Time Zone: Pacific Time (US & Canada).